AWSSpirits distillerOther Industries

Spirits distiller cuts SAP AWS bill 34 percent without touching production sizing

Indian-made foreign liquor and malt producer, 9 bottling units across states, about 1,000 SAP users · AWS Asia Pacific (Mumbai) · 8 weeks

Amazon Web Services
01

As-is situation

The distiller had moved S/4HANA, BW/4HANA and a state excise integration landscape to AWS 14 months earlier. All 17 SAP instances, including sandbox, training and two project quality systems, ran 24x7 on demand pricing. No Savings Plans or Reserved Instances had been bought because the migration partner left before the decision. Finance saw one AWS bill line for SAP and could not split it by system, while state-wise excise reporting needed cost by business unit.

  • 17 SAP instances all on on-demand pricing, 14 months after go-live.
  • Non-production used about 45 hours a week but ran 168 hours.
  • No SID-level tagging, so cost by system or business unit was unknown.
02

Approach, tools and architecture

NTSPL tagged all resources by SID, tier and cost centre and published the first SID-level report in two weeks. Instance Scheduler stopped development, quality, training and sandbox outside a 7 am to 9 pm weekday window, with exceptions for the excise integration test system during state duty-change periods. Production and DR HANA were covered by three-year Reserved Instances after a growth review, and application servers by an EC2 Instance Savings Plan. Orphaned EBS snapshots from migration were removed.

Tagging by SID → Cost and Usage Report → SID cost view → Instance Scheduler for non-prod → RIs for HANA + Savings Plan for app servers → monthly review
AWS Cost and Usage ReportsAWS Cost ExplorerAWS Instance SchedulerAmazon EC2 Reserved InstancesEC2 Instance Savings Plans
03

Implementation approach

Weeks 1-2 · Tagging and baselineTags applied and first cost per SID published to finance.
Weeks 3-5 · Schedules and cleanupCalendars agreed with Basis and project teams, schedules automated, snapshots cleaned.
Weeks 6-8 · CommitmentsCoverage modelled and purchases approved by the CFO.
04

Measured results

Monthly SAP AWS bill
INR 41 lakh→INR 27 lakh
Non-production weekly runtime
168 hours→70 hours
Commitment coverage of steady SAP capacity
0 percent→86 percent
SAP resources tagged by SID
0 percent→99 percent

Operational improvements

  • Override requests for test cycles are approved through a ticket and applied within 30 minutes.
  • Finance now allocates SAP cloud cost to state business units in monthly management accounts.
05

Cost considerations

Reserved Instances required an upfront payment option agreed with treasury. Engagement effort was 24 consultant-days plus a monthly review. Schedules needed small Basis changes for job start times.

06

Return on investment

ROI indicator

Monthly savings of INR 14 lakh give about INR 1.7 crore a year in realized savings, against a one-time engagement below INR 15 lakh and a modest monthly review fee.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.