Microsoft AzureSugarOther Industries

Sugar mill group matches SAP capacity to the crushing season on Azure

Integrated sugar, ethanol and co-generation group, 6 mills, about 1,300 SAP users at peak · Azure Central India (Pune) · 9 weeks

Amazon Web Services
01

As-is situation

The group ran S/4HANA on Azure with eight application servers sized for the crushing season, when cane weighbridge integration, grower payments and sugar dispatch peak. Outside the season, dialog users fell by about 60 percent, but all servers ran year-round. HANA used memory had reached 82 percent, and the Basis team had requested the next M-series size. Development and quality also ran 24x7, and app servers were on pay-as-you-go pricing.

  • Eight app servers ran year-round though only three were needed off-season.
  • HANA upsize request would raise database VM cost by about 70 percent.
  • Non-production and app servers had no commitments or schedules.
02

Approach, tools and architecture

NTSPL split application servers into a base of three covered by an Azure savings plan for compute and five seasonal servers started for the crushing season and stopped after it, with logon groups adjusted by Basis. Start/Stop VMs v2 handled development and quality nightly. Instead of the HANA upsize, an NSE and archiving review moved old cane payment and weighbridge partitions to warm storage and archived two closed seasons, reducing used memory to 61 percent. Production HANA kept its existing reservation.

SID cost view → base 3 app servers on savings plan + 5 seasonal servers → Start/Stop VMs v2 for non-prod → NSE and archiving instead of HANA upsize
Azure savings plan for computeAzure ReservationsStart/Stop VMs v2Microsoft Cost ManagementSAP HANA Native Storage Extension
03

Implementation approach

Weeks 1-2 · Season profileThree years of dialog and batch load analysed by month and mill.
Weeks 3-5 · App tier and schedulesBase and seasonal servers defined, logon groups changed and non-production scheduled.
Weeks 6-9 · Memory reliefNSE partitions and archiving of two closed seasons completed and tested.
04

Measured results

Off-season app servers running
8→3
HANA used memory at peak
82 percent→61 percent
Annual SAP Azure cost
INR 3.6 crore→INR 2.5 crore

Operational improvements

  • Seasonal server start-up is a scheduled runbook in October, tested two weeks before cane arrives.
  • Monthly SAP cost reviews show cost per tonne of cane crushed as a unit measure.
05

Cost considerations

The savings plan covered base capacity, and seasonal servers ran on demand for about six months. Archiving required agreement from cane accounting and auditors. Engagement effort was 30 consultant-days.

06

Return on investment

ROI indicator

Annual savings of about INR 1.1 crore, plus the avoided HANA upsize, give a payback in under three months. SAP IT cost per tonne of cane crushed dropped by roughly 30 percent.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.