Municipal corporation keeps property-tax collection online through a DR event

Municipal corporation serving 1.8 million residents, 4.2 lakh property assessments · Central India, hosted in a state data centre · 10 weeks

Amazon Web Services
01

As-is situation

Property-tax assessment, birth and death certificates, trade licences and grievance redressal ran on a Java application with PostgreSQL on 9 physical servers in the state data centre, backed up weekly to tape by a facility management vendor. The last year-end tax collection drive generated 62 percent of annual property-tax revenue in the final six weeks. During that window the database server's RAID controller failed, and restoring from a five-day-old tape lost assessment updates, forcing counter staff to reconcile manually for two weeks while the citizen portal stayed offline for 3 days.

  • Weekly tape backups with an effective RPO of up to 7 days
  • 3-day portal outage during the peak tax collection period
  • Physical servers with no hypervisor, making image-based replication impossible as-is
  • State IT department requirement that citizen data remain within India
02

Selected Microsoft Azure services and architecture

NTSPL first virtualized the nine servers onto a Hyper-V cluster in the same state data centre, then protected them with Site Recovery replicating into Azure Central India, with a recovery plan that starts PostgreSQL, the application servers and the citizen portal behind Application Gateway with WAF. Daily backups of all VMs via MABS go to an immutable Recovery Services vault in Central India with GRS to South India, plus 15-minute PostgreSQL WAL archiving to Azure Blob Storage with immutability policies. Payment-gateway callbacks are switched to the Azure endpoint by a runbook. The vendor runs half-yearly test failovers, with the municipal IT cell observing.

Citizens and counter staff → Application Gateway WAF → Java application VMs → PostgreSQL (Hyper-V in state data centre) → Site Recovery to Azure Central India + MABS backup to immutable vault + WAL archive to immutable Blob
Azure Site Recovery (Hyper-V to Azure)Microsoft Azure Backup ServerImmutable Recovery Services vaultAzure Blob Storage immutability policiesAzure Application Gateway WAFAzure Monitor alerts
03

Implementation approach

Weeks 1-3 · Assess and virtualizeConverted the 9 physical servers to Hyper-V VMs in a planned weekend window and validated application behaviour.
Weeks 4-6 · ProtectEnabled Site Recovery and MABS backup, configured WAL archiving and built the recovery network in Central India.
Weeks 7-9 · Plan and drillAuthored recovery plans for the tax, certificate and grievance modules and ran a full test failover with counter staff verifying transactions.
Week 10 · GovernanceWrote the DR SOP for the facility management vendor and set drill dates ahead of the next tax season.
04

Measured results

Recovery point objective
Up to 7 days→15 minutes for the tax database
Citizen portal restoration time
3 days→Under 2 hours (measured drill)
Manual reconciliation after an outage
2 weeks→None required in drill
Backup tape handling
Weekly, off-site courier→Retired

Operational improvements

  • The facility management vendor follows a written DR SOP with half-yearly drills observed by the municipal IT cell
  • Tape rotation and courier pickups are eliminated
  • Payment-gateway callback switching is automated in the recovery plan instead of a manual vendor request
05

Cost considerations

Hyper-V virtualization was a prerequisite cost, but it also cut the hardware refresh from 9 servers to 3 hosts. Azure compute is incurred only during drills or failover, so the steady-state bill is Site Recovery instance fees and storage. The corporation chose pay-as-you-go over reservations because DR VMs rarely run.

06

Return on investment

ROI indicator

Indicatively, peak-season collections run INR 8 to 12 crore a week, so even one day of avoided downtime protects far more than the INR 18 to 22 lakh annual DR running cost. Retiring tape handling and courier contracts saves a further INR 4 to 6 lakh a year.