Microsoft AzureThird-party logistics and warehousingLogistics, Travel & Hospitality

3PL operator cuts warehouse system recovery time from 2 days to 45 minutes

3PL with 22 warehouses, 3.4 million sq ft, serving e-commerce and FMCG clients · Pan-India, primary operations in Bhiwandi and Hosur · 8 weeks

Amazon Web Services
01

As-is situation

The company ran its warehouse management system, a .NET application on SQL Server 2019, and its yard and dock-scheduling module on 14 VMs in Azure Central India. Handheld scanners at all 22 sites depended on it in real time. Backups were nightly VM snapshots retained for 7 days in the same region. Client contracts carried SLA penalties for dispatch delays, and two large e-commerce clients had added a DR clause during festive-season negotiations. When a storage misconfiguration made the WMS database unavailable for 9 hours, dispatch staff fell back to paper picklists and rekeyed 18,000 lines afterwards.

  • No secondary region; estimated rebuild from backup of about 2 days
  • Nightly crash-consistent snapshots only, giving up to 24 hours of lost scans
  • Contractual SLA penalties of up to INR 4 lakh per hour during peak season
  • Client audit requirement for a documented and tested DR drill
02

Selected Microsoft Azure services and architecture

NTSPL classified the WMS database, application and integration servers as tier 1 and replicated them with Site Recovery to South India, with app-consistent snapshots hourly on the SQL VMs. Because Site Recovery alone cannot protect against data corruption, SQL Server workload backup with 15-minute log backups was added in an immutable GRS vault. A recovery plan brings up SQL first, then the app tier, re-points private DNS records and runs a scripted health check against the scanner API. Scanner gateways at warehouses use a DNS name with 120-second TTL, so they reconnect without reconfiguration. Reporting servers were tiered down to backup-only with Cross Region Restore.

Warehouse handhelds → scanner gateway (DNS, 120 s TTL) → WMS app VMs (Central India) → SQL Server VMs → Site Recovery to South India + SQL log backups to immutable GRS vault
Azure Site RecoveryAzure Backup (SQL Server in Azure VM)Immutable Recovery Services vaultAzure Automation runbooksAzure Private DNSAzure Business Continuity Center
03

Implementation approach

Weeks 1-2 · TieringMapped 14 VMs and integrations with operations and clients, agreed RPO 15 minutes and RTO 1 hour for dispatch-critical components.
Weeks 3-5 · BuildBuilt the South India DR hub, enabled replication and SQL workload backup, and authored the recovery plan with DNS runbooks.
Weeks 6-7 · DrillsRan two test failovers; the first took 2 hours 10 minutes due to a firewall rule gap, the second 45 minutes.
Week 8 · HandoverDelivered the drill report to both e-commerce clients and trained the night-shift team on failover execution.
04

Measured results

Recovery time for WMS
About 2 days (rebuild)→45 minutes (measured drill)
Maximum data loss
Up to 24 hours of scans→Under 15 minutes
Backup retention
7 days, same region→35 days daily, 12 monthly, immutable GRS
Client DR audit findings
2 open→Closed

Operational improvements

  • Night-shift operators can execute the recovery plan from a one-page runbook without escalating to the vendor
  • Replication health and RPO breaches raise alerts to the NOC instead of being discovered during an incident
  • Paper picklist fallback is no longer part of the business continuity plan
05

Cost considerations

Site Recovery was limited to 6 dispatch-critical VMs; 8 reporting and integration VMs were tiered down to backup with Cross Region Restore, roughly halving the DR bill. Replica disks use Standard SSD, accepting slower performance for the first hours after failover. DR compute is paid only during drills or real failover.

06

Return on investment

ROI indicator

Indicatively, the DR set-up costs INR 1.1 to 1.4 lakh a month, while a single 9-hour outage in peak season had exposed the company to INR 25 to 35 lakh in penalties and overtime. The firm retained both e-commerce contracts at renewal, which management considered the deciding return.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.