India’s Leading Domain & Web Hosting Provider

  • Chat
    Live Chat 24 X 7 online support
  • Contact NTSPL Hosting support
    Call Now +91 - 8260003333
AWSTilesOther Industries

Ceramic tiles maker fixes slow S/4HANA month-end postings by rebuilding storage tiers

Ceramic and vitrified tiles manufacturer, 5 plants, 2,600 dealers, about 1,400 SAP users · AWS Asia Pacific (Mumbai) · 5 weeks

Amazon Web Services
01

As-is situation

The tiles maker had gone live on S/4HANA on AWS a year earlier through a previous partner. All environments had been built by hand. Production HANA used a single gp2 volume group for data and log, and two of three application servers sat in a different availability zone from the database. Month-end billing for dealer schemes and rebate settlements slowed sharply, and finance had pushed close by two days twice in a quarter.

  • Average HANA log write latency peaked at 2.6 ms during month-end billing runs.
  • Two application servers were in a different zone, adding roughly 1 ms to each database round-trip.
  • Quality and production differed in OS patch level and kernel parameters, so performance tests in quality did not predict production.
02

Approach, tools and architecture

NTSPL codified the landscape in Terraform and rebuilt it tier by tier. Production HANA moved to separate io2 Block Express volumes for log and gp3 striped volumes for data, sized for throughput and validated with HCMT. Application servers were rebuilt in the database zone and the old ones drained and removed. The OS baseline was reset with SLES for SAP and saptune on all hosts, and a weekly drift report compared quality with production. The cutover to the new storage used a HANA backup and restore in a four-hour Saturday window.

Terraform baseline → io2 Block Express log + gp3 data → HCMT → app servers rebuilt in HANA zone → saptune → drift report
Amazon EC2 X2 instancesAmazon EBS io2 Block ExpressAmazon EBS gp3Amazon EFSAWS Systems ManagerTerraform
03

Implementation approach

Weeks 1-2 · Codify current stateExisting resources imported into Terraform and target layout agreed with Basis.
Weeks 3-4 · Non-production rebuildDevelopment and quality rebuilt to the new layout and tested with a month-end billing replay.
Week 5 · Production storage cutoverHANA restored onto new volumes in a 4-hour window and app servers moved into the database zone.
04

Measured results

Peak HANA log write latency at month-end
2.6 ms→0.4 ms
Dealer billing and rebate run at month-end
9 h 20 min→4 h 05 min
Finance close delays in the following two quarters
2 delays per quarter→None

Operational improvements

  • Quality is now a faithful performance predictor for production, so transport testing finds problems before go-live.
  • Resizing an application server is a reviewed code change completed the same day.
05

Cost considerations

io2 Block Express raised production storage cost by about INR 1.1 lakh a month, partly offset by right-sizing over-provisioned data volumes. Removing an idle fourth application server saved slightly more than the storage increase, so the net monthly bill was roughly flat.

06

Return on investment

ROI indicator

Bringing month-end billing under five hours removed the two-day close slippage. The finance team estimated that earlier dealer scheme settlements cut credit-note disputes, worth an indicative INR 40 lakh a year in avoided write-offs and collection effort.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.