Ceramic tiles maker fixes slow S/4HANA month-end postings by rebuilding storage tiers
Ceramic and vitrified tiles manufacturer, 5 plants, 2,600 dealers, about 1,400 SAP users · AWS Asia Pacific (Mumbai) · 5 weeks
As-is situation
The tiles maker had gone live on S/4HANA on AWS a year earlier through a previous partner. All environments had been built by hand. Production HANA used a single gp2 volume group for data and log, and two of three application servers sat in a different availability zone from the database. Month-end billing for dealer schemes and rebate settlements slowed sharply, and finance had pushed close by two days twice in a quarter.
- Average HANA log write latency peaked at 2.6 ms during month-end billing runs.
- Two application servers were in a different zone, adding roughly 1 ms to each database round-trip.
- Quality and production differed in OS patch level and kernel parameters, so performance tests in quality did not predict production.
Approach, tools and architecture
NTSPL codified the landscape in Terraform and rebuilt it tier by tier. Production HANA moved to separate io2 Block Express volumes for log and gp3 striped volumes for data, sized for throughput and validated with HCMT. Application servers were rebuilt in the database zone and the old ones drained and removed. The OS baseline was reset with SLES for SAP and saptune on all hosts, and a weekly drift report compared quality with production. The cutover to the new storage used a HANA backup and restore in a four-hour Saturday window.
Implementation approach
Measured results
Operational improvements
- Quality is now a faithful performance predictor for production, so transport testing finds problems before go-live.
- Resizing an application server is a reviewed code change completed the same day.
Cost considerations
io2 Block Express raised production storage cost by about INR 1.1 lakh a month, partly offset by right-sizing over-provisioned data volumes. Removing an idle fourth application server saved slightly more than the storage increase, so the net monthly bill was roughly flat.
Return on investment
Bringing month-end billing under five hours removed the two-day close slippage. The finance team estimated that earlier dealer scheme settlements cut credit-note disputes, worth an indicative INR 40 lakh a year in avoided write-offs and collection effort.