India’s Leading Domain & Web Hosting Provider
Cosmetics brand catches HANA log fill 40 minutes before stuck invoicing
Colour cosmetics and skincare brand, 2 factories, 3 warehouses, e-commerce and modern trade, about 700 SAP users · Google Cloud Mumbai (asia-south1) · 6 weeks to takeover, 14 weeks including first patch cycle
As-is situation
The cosmetics company ran S/4HANA on Google Cloud after a migration by a systems integrator, with Basis handled by a two-person internal team. Monitoring meant Cloud Monitoring VM dashboards plus manual checks in SAP. During a festive sale, a HANA log volume filled after Backint log backups started failing, and invoicing for marketplace orders stopped for 2 hours 20 minutes. HANA revision and kernel were 15 months behind. Operators received about 350 alerts a week, mostly VM CPU notices.
- A log volume fill stopped invoicing for 2 h 20 min during a festive sale.
- About 350 alerts a week, with fewer than 5 percent actionable.
- HANA revision and SAP kernel were 15 months behind, with no patch calendar.
Approach, tools and architecture
NTSPL deployed the Google Cloud Agent for SAP on all HANA and NetWeaver hosts, routed HANA and NetWeaver metrics to Cloud Monitoring and built a 64-entry alert catalogue with runbooks, including log volume fill at 70 percent and any failed log backup. SAP Cloud ALM was activated for job and integration monitoring of marketplace interfaces. A quarterly patch calendar avoided sale events. The first cycle brought HANA and kernel to current levels in eight weeks, sandbox through production.
Implementation approach
Measured results
Operational improvements
- Marketplace order interfaces are monitored in Cloud ALM and failures reach the e-commerce integration owner directly.
- The internal Basis team now focuses on design and projects instead of night checks.
Cost considerations
Cloud Monitoring and Logging costs rose modestly with SAP metrics. The managed service fee replaced planned hiring of two night-shift Basis staff. Patching needed no extra infrastructure beyond short-lived sandbox copies.
Return on investment
The festive outage had delayed about 18,000 marketplace orders and triggered seller-rating penalties. Preventing a repeat protects an indicative INR 1.5 to 2 crore of sale-period revenue, and the avoided hires save about INR 30 lakh a year.