Tractor maker keeps assembly-line RFC calls under 30 ms after moving SAP to Mumbai

Tractor and farm equipment manufacturer, 3 assembly plants, 900 dealers, about 1,900 SAP users · Google Cloud Mumbai (asia-south1) · 10 weeks

Amazon Web Services
01

As-is situation

The tractor maker planned to move ECC on HANA from its plant data centre in north India to Google Cloud Mumbai. The assembly line MES confirmed each tractor's backflush and serial number to SAP through about 40 synchronous RFC calls per unit, around 30,000 calls a shift. On the plant LAN each call took under 2 ms. A test from the plant over the existing internet VPN showed 48 ms average and frequent spikes over 200 ms, which would have slowed the line.

  • 40 synchronous RFC calls per tractor, roughly 30,000 per shift, sensitive to latency spikes.
  • Internet VPN tests showed 48 ms average and spikes above 200 ms.
  • Seven bank and two GSP integrations whitelisted the plant data centre IPs.
02

Approach, tools and architecture

NTSPL designed Partner Interconnect from two carrier locations into Mumbai, with SD-WAN at plants marking MES and SAP GUI traffic in the top QoS class. The MES team grouped confirmation calls into four aggregated RFCs per tractor, using a function module containerper built with SAP developers. Outbound partner traffic used Cloud NAT with reserved static addresses registered six weeks ahead. Application servers and HANA shared a zone with no inspection between them, and niping results were recorded.

Plant MES → SD-WAN QoS → Partner Interconnect x2 → Network Connectivity Center → app servers → HANA; Cloud NAT static IPs → banks and GSPs
Partner InterconnectNetwork Connectivity CenterCloud NATCloud DNSCloud NGFWSAP RFC containerper function module
03

Implementation approach

Weeks 1-2 · Flow mappingMES, dealer, bank and GSP flows mapped and latency budgets agreed.
Weeks 3-8 · Interconnect and RFC redesignCircuits commissioned while MES calls were aggregated and tested.
Weeks 9-10 · Shift-change load testLine simulation run at shift change and partner tests completed from new IPs.
04

Measured results

Average plant-to-SAP round-trip
48 ms over internet VPN→22 ms over Interconnect
RFC calls per tractor
40→4
Assembly line stoppages caused by SAP confirmations
Projected several per shift→0 in first quarter
Partner integrations failing on cutover day
Risk of 9→0

Operational improvements

  • Latency probes from each plant feed Cloud Monitoring, and alerts reach both plant IT and the SAP operations team.
  • Aggregated RFCs reduced SAP dialog work process usage during shift changes.
05

Cost considerations

Partner Interconnect circuits and carrier charges added about INR 6 lakh a month, partly offset by retiring the plant data centre's internet links. RFC redesign took 18 developer-days on the MES and SAP sides.

06

Return on investment

ROI indicator

The line produces roughly 60 tractors a shift. Avoiding even 15 minutes of stoppage a day protects an indicative INR 2 to 3 crore of monthly output, so the connectivity and redesign cost paid back within the first month of operation.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.