Cables and wires maker replaces an undrilled on-prem DR with Chennai SAP recovery
Power cables, building wires and FMEG maker, 4 plants, 3,500 channel partners, about 2,000 SAP users · Azure Central India (Pune) primary, South India (Chennai) DR · 6 weeks
As-is situation
After moving ECC on HANA to Azure Central India, the company still paid for an on-prem DR site in its old co-location data centre, receiving HANA log backups over MPLS. The DR site had not been drilled in three years, its servers were six years old, and the co-location contract was up for renewal at a higher rate. Copper price-linked billing meant SAP pricing updates ran several times a day, and channel partner orders came through a portal over RFC.
- On-prem DR had not been drilled in 3 years and its hardware was out of warranty.
- Log backup shipping over MPLS gave an RPO of about 45 minutes during peak.
- Co-location renewal would have cost about INR 48 lakh a year for DR alone.
Approach, tools and architecture
NTSPL built a DR HANA VM in Azure South India with async HSR from the Central India primary in a multi-target setup alongside the existing zonal secondary. Application servers were protected with Azure Site Recovery, and Azure NetApp Files cross-region replication carried /sapmnt and transports. Azure DNS private zones held DR records for SAP hosts and the partner portal RFC endpoint. The first drill moved production to Chennai on a Sunday, ran pricing updates and portal orders, and failed back the following weekend.
Implementation approach
Measured results
Operational improvements
- Azure Business Continuity Center gives one view of Site Recovery and backup health for SAP resources.
- DR drills are now on the IT calendar twice a year, away from quarter-end and copper price reset days.
Cost considerations
Azure DR standby cost was about INR 38 lakh a year including a reserved DR HANA VM and Site Recovery licences, compared with INR 48 lakh for co-location alone before hardware refresh. Inter-region data transfer was within the estimate.
Return on investment
Exiting co-location and avoiding a DR hardware refresh of roughly INR 1.1 crore gives an indicative three-year saving of about INR 1.4 crore, while improving RPO from 45 to under 3 minutes.