Glass bottle maker proves SAP failover in 18 tests before its furnace relining shutdown
Container glass manufacturer for beverages and pharma, 3 furnaces running 24x7, about 700 SAP users · AWS Asia Pacific (Hyderabad) · 3 weeks
As-is situation
The glass maker had moved S/4HANA to AWS Hyderabad with a Pacemaker cluster built by a previous partner. Furnaces run continuously, and SAP drives batch weighing instructions, quality release and dispatch. The cluster had never been tested. During a HANA process crash, the overlay IP failed to move because the route table permission had been removed during an IAM cleanup, and production stopped for 52 minutes on a night shift. Auditors for a multinational beverage customer asked for failover evidence.
- One failed takeover had caused a 52-minute outage because of a missing route-table permission.
- No test catalogue or timings existed, and the cluster configuration was not under version control.
- Fencing timeouts were set below the EC2 stop time, risking failed fences.
Approach, tools and architecture
NTSPL audited the cluster against SUSE and AWS reference guides, restored least-privilege IAM permissions for route table updates and EC2 stop and start, and raised fencing timeouts. Cluster configuration was exported and stored in Git. An 18-case test catalogue covered HANA crash, node crash, network isolation, ASCS kill, EFS unreachability and planned maintenance. Tests ran in quality, then in production in two windows scheduled with the plant ahead of the planned furnace relining shutdown, when demand was lowest.
Implementation approach
Measured results
Operational improvements
- An IAM change-review step now flags any edit to cluster role permissions before it is applied.
- The customer audit closed with the signed failover evidence pack as the main artefact.
Cost considerations
No new infrastructure was needed; the effort was 16 consultant-days of audit and testing. Production test windows were planned to avoid furnace pull rate changes, which had no direct cloud cost but needed plant coordination.
Return on investment
A night-shift SAP stop delays quality release and dispatch of about 180 tonnes of bottles an hour. Preventing one repeat 52-minute outage avoids an indicative INR 35 lakh of delayed dispatch and potential penalties, many times the audit cost.