Edible oil refiner cuts SAP outage from a host fault to 4 minutes with zonal HSR

Edible oil refining and packing company, 4 refineries, 1,800 distributors, about 1,600 SAP users · Azure Central India (Pune) · 5 weeks

Amazon Web Services
01

As-is situation

The refiner ran S/4HANA on Azure in a single zone with one HANA VM and one combined ASCS and application server VM. In the previous year a host maintenance event and a VM freeze had stopped SAP for 3 hours 10 minutes and 1 hour 40 minutes, both during evening dispatch peaks when 300 to 400 tankers and trucks were loading. Invoices and e-way bills could not be generated, and trucks waited at refinery gates overnight.

  • Two unplanned outages totalling nearly 5 hours in 12 months, both in dispatch peaks.
  • ASCS shared a VM with the primary application server, so any VM fault stopped the whole system.
  • No second zone was used, and backups restored to a new VM in about 3 hours.
02

Approach, tools and architecture

NTSPL built a secondary HANA VM in another zone of Central India and configured syncmem HSR with logreplay and preload. ASCS and ERS were separated onto their own VMs on ENSA2 across the two zones, with Azure Standard Load Balancer floating IPs for both clusters. Fencing used the Azure fence agent with a managed identity restricted to the four cluster VMs. Application servers were spread across zones, and /sapmnt moved to zone-redundant Azure Files NFS. Sixteen failure cases were tested in quality and production.

HANA zone 1 → syncmem HSR → HANA zone 2 → Azure fence agent → Load Balancer floating IP → ASCS/ERS ENSA2 cluster
Azure M-series VMsAzure Standard Load BalancerAzure Files NFS with ZRSPacemaker on SLES for SAPAzure Monitor for SAP solutions
03

Implementation approach

Weeks 1-2 · Second-zone buildSecondary HANA, ASCS and ERS VMs built and shared files moved to ZRS storage.
Week 3 · Cluster configurationHSR, Pacemaker, fence agent and load balancer probes configured in quality first.
Week 4 · Failure testsSixteen cases run in quality, then nine key cases in production on a Sunday window.
04

Measured results

Business outage from a HANA VM fault
1 h 40 min to 3 h 10 min→4 min 10 s measured
ASCS failover with locks preserved
Not possible→75 seconds, no lock loss
Unplanned SAP outages over 15 minutes in following 12 months
2→0

Operational improvements

  • Monthly OS patching is done node by node in cluster maintenance mode with no business downtime.
  • Azure Monitor for SAP solutions alerts on replication status, and on-call staff follow a single takeover runbook.
05

Cost considerations

The secondary HANA VM added the largest cost, covered by a three-year reservation. The extra ASCS/ERS VMs were small. Total SAP infrastructure cost rose by about 38 percent, which the CFO approved against the cost of gate delays.

06

Return on investment

ROI indicator

Each evening outage had held back around 300 trucks and an estimated INR 25 to 30 lakh of dispatch value per hour. Avoiding two such events a year gives an indicative benefit of INR 1.2 to 1.5 crore, above the annual HA run cost.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.