Aluminium extruder avoids a HANA instance upgrade by moving 1.1 TB to NSE

Architectural and industrial extrusions producer, 3 press lines across 2 sites, about 900 SAP users · Azure Central India (Pune) · 5 weeks

Amazon Web Services
01

As-is situation

The company ran S/4HANA 2021 on an Azure M-series VM with 3.8 TB of usable HANA memory. Used memory had grown from 2.4 TB to 3.2 TB in 18 months, driven by MATDOC and ACDOCA growth and seven years of quality inspection lots kept online for customer audits. The Basis lead had requested the next certified M-series size, which would nearly double the database VM cost. Finance had not agreed any archiving policy.

  • Peak used memory reached 84 percent of the global allocation limit during month-end close.
  • Inspection lot and material document partitions older than three years made up 1.3 TB of column store but were queried only during customer audits.
  • No archiving had been run since go-live, and statutory retention rules had not been mapped to SAP objects.
02

Approach, tools and architecture

NTSPL profiled M_CS_TABLES and access statistics over 90 days, then partitioned MATDOC, ACDOCA and QALS-related tables by fiscal year where not already partitioned. Partitions older than three fiscal years were made page-loadable through NSE, with the buffer cache sized at 120 GB after testing. The change was rehearsed on a production-sized copy with replayed audit reports. In parallel, a retention matrix was agreed with the CFO and auditors so archiving of closed years could start the following quarter.

Table profiling → fiscal-year partitioning → NSE page-loadable partitions → 120 GB buffer cache → copy validation → production change
SAP HANA Native Storage ExtensionAzure M-series VMsPremium SSD v2Azure Monitor for SAP solutionsSAP HANA cockpit
03

Implementation approach

Weeks 1-2 · ProfilingTable and partition access patterns analysed over 90 days of monitoring data.
Weeks 3-4 · Copy validationPartitioning and NSE applied on a refreshed copy and audit reports timed.
Week 5 · Production changeChanges applied in two Saturday windows with rollback scripts ready.
04

Measured results

Column-store memory in use
3.2 TB→2.1 TB
Peak memory vs allocation limit at close
84 percent→56 percent
Customer audit report runtime on old lots
48 seconds→61 seconds
NSE buffer cache hit ratio
Not applicable→97 percent

Operational improvements

  • Monthly memory reviews now include NSE hit ratio and partition growth, so future tiering is planned rather than reactive.
  • Restart after HANA patching shortened because less data loads into memory at startup.
05

Cost considerations

The engagement took 24 consultant-days. Premium SSD v2 throughput was increased slightly to serve NSE page reads, adding a small monthly cost. Archiving was scheduled separately and is expected to free a further 400 to 600 GB without additional storage spend.

06

Return on investment

ROI indicator

Avoiding the next M-series size kept the database VM on its existing three-year reservation. The indicative avoided cost is around INR 1.5 crore over the remaining reservation term, against a one-time engagement cost below INR 20 lakh.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.