Aerospace components maker protects its PLM vault with 1-hour restore points
Precision components supplier to aircraft and defence programmes, 1,100 employees · Southern India, plants near Bengaluru and Hyderabad · 9 weeks
As-is situation
Engineering ran a PLM system on Compute Engine with an Oracle database VM, four file vault servers holding 18 TB of CAD models and drawings on zonal persistent disks, and a licence server for design software. Backups were weekly full and daily incremental copies by an ageing agent-based tool to a Cloud Storage bucket. A failed patch corrupted the PLM file vault index; recovery from the previous night's incremental took 31 hours and lost a day of design changes for 140 engineers. Prime contractors' supplier audits now required evidence of backup integrity and recovery testing for export-controlled technical data.
- Daily backups gave an RPO of up to 24 hours for design data changing every few minutes
- 31-hour recovery left 140 engineers idle and delayed a first-article inspection
- Licence server on a zonal disk was a single point of failure for every CAD seat
- Oracle backups were crash-consistent only, with no archive log capture
Selected Google Cloud services and architecture
NTSPL replaced the legacy tool with the Backup and DR appliance managed from the management console, capturing application-consistent Oracle backups with archive logs every hour and hourly incremental-forever backups of the file vault disks. Restores use instant mount, presenting a backup image to a recovery VM in minutes while data moves in the background. File vault and licence server disks moved to Hyperdisk Balanced High Availability across two zones in asia-south1 Mumbai. Weekly copies are written to a cross-region vault in asia-south2. All locations are pinned to India, and technical data stays in a VPC Service Controls perimeter.
Implementation approach
Measured results
Operational improvements
- Restoring a single overwritten drawing takes minutes from an instant-mounted image instead of a full restore
- Supplier audit evidence is exported from the management console's job history rather than assembled by hand
- Patching the licence server no longer stops all CAD seats because the standby VM can take over
Cost considerations
Hyperdisk Balanced High Availability roughly doubled disk cost for 18 TB, which the team accepted only for file vault and licence disks, not scratch volumes. The appliance's compute was sized for hourly incrementals, not for peak restore throughput, trading slightly slower full restores for lower steady cost. Licensing savings from the retired tool offset most of the increase.
Return on investment
One day of lost engineering time for 140 people costs the business roughly INR 25 to 30 lakh including delay penalties. The new design runs at about INR 1.6 lakh per month, and retiring the old backup tool's licence saved around INR 11 lakh a year, giving indicative payback within the first year even with no repeat incident.