Auto components maker cuts CAE simulation queue from 3 days to 6 hours with Spot bursts
Tier-1 supplier, about 2,800 employees, engineering centre of 120 CAE engineers · Southern India (Chennai and Hosur plants) · 11 weeks
As-is situation
The engineering centre ran crash, durability and CFD simulations on a 24-node on-premises HPC cluster bought six years earlier, with 768 cores managed by a basic job scheduler. Before each OEM design-freeze gate, job queues stretched to around 72 hours and engineers cut mesh resolution to get results in time. Utilization swung from 95% in the three weeks before a gate to under 25% in between. Replacing the cluster was quoted at about INR 3.2 crore, with another refresh due in five years, and solver licences were partly wasted waiting for cores.
- Peak queue time of about 72 hours before design-freeze gates, delaying two OEM submissions in the past year
- Fixed 768-core capacity, idle about 70% of the year but saturated at gates
- Solver licence tokens bound to a licence server on the plant network, which had to stay authoritative
- Simulation input and result files of 20-80 GB per run that needed fast shared storage
Selected AWS services and architecture
NTSPL built a burst tier in ap-south-1 that keeps the on-premises cluster as the steady base. AWS ParallelCluster provisions Slurm queues backed by EC2 Auto Scaling: an On-Demand queue of c7i instances for licence-heavy jobs with deadlines, and a Spot queue spanning c6i, c7i, c6a and c7a families for parameter sweeps that checkpoint every 30 minutes. Tightly coupled crash runs use hpc-class instances with Elastic Fabric Adapter in a cluster placement group. Amazon FSx for Lustre linked to an S3 bucket provides scratch storage, and the licence server is reached over the existing Site-to-Site VPN. Queues scale to zero when empty.
Implementation approach
Measured results
Operational improvements
- Engineers submit to the same Slurm commands for on-premises and cloud queues, so no retraining was needed
- Queues scale to zero after jobs finish, removing the need to power nodes down manually after gates
- Per-programme budget tags show the CAE manager the compute cost of each design iteration
Cost considerations
Solver licences, not compute, were the scarce resource, so licence-heavy jobs run On-Demand to avoid wasting tokens on interrupted runs, while parameter sweeps use Spot. No Savings Plan was bought because demand is concentrated around gates. FSx for Lustre is created per gate and deleted afterwards, with results kept in S3.
Return on investment
The company deferred the INR 3.2 crore cluster replacement and spends an indicative INR 45-60 lakh a year on burst compute, concentrated in gate months. Engineers now run full-resolution meshes, and the programme office estimates that eliminating late OEM submissions protects contracts worth several crore annually.