India’s Leading Domain & Web Hosting Provider
Paints manufacturer gets 4-minute HANA failover and in-country DR on Google Cloud
Paints manufacturer with 6 plants, 30 depots and 18,000 dealers · Western and Southern India · 8 weeks
As-is situation
The company ran SAP ECC on HANA with a 1.8 TB database on Compute Engine in a single Mumbai zone, migrated two years earlier as a lift-and-shift without high availability. DR was a nightly HANA backup copied to a Delhi bucket, with a documented RTO of 24 hours that had never been tested. Dealer orders flowed through an integration platform into SAP throughout the day, and tinting machines at dealers synced shade formulas from SAP. When a zonal incident hit, SAP was down for 3 hours 40 minutes; dealers could not place orders and depots halted dispatch.
- Single-zone HANA with no HA, causing a 3 hour 40 minute outage
- Untested DR with a 24-hour RTO and up to 24 hours of potential data loss
- Dealer orders and tinting formula sync dependent on continuous SAP availability
- No validation that the landscape matched SAP and Google Cloud best practices
Selected Google Cloud services and architecture
NTSPL built a two-node Pacemaker cluster for HANA across two Mumbai zones using the Red Hat high-availability add-on with Google Cloud fence and load balancer agents, with synchronous HANA System Replication and table preload. ASCS and ERS were clustered similarly, with shared files on Filestore. A third HANA node in asia-south2 receives asynchronous replication for DR. Workload Manager now evaluates the landscape weekly. Backint backups go to Cloud Storage with a retention policy, and Backup and DR Service provides faster system copies for QA refreshes. Agent for SAP metrics feed Cloud Monitoring alerts on replication status and cluster health.
Implementation approach
Measured results
Operational improvements
- Zonal maintenance events are handled by planned takeover instead of downtime
- Weekly Workload Manager evaluations catch configuration drift after patching
- QA refreshes use Backup and DR mounts, so testing is no longer days behind production
Cost considerations
The secondary HANA node doubled database compute in Mumbai, covered by three-year committed use discounts. The Delhi DR node runs a smaller machine type and hosts a sandbox that is shut down on invocation. Red Hat for SAP with HA add-on licences were billed per instance through Google Cloud.
Return on investment
One day of order and dispatch outage is worth about INR 6 to 8 crore in delayed sales. The HA and DR additions cost roughly INR 7 lakh per month, which the company considers insurance against a repeat of last year's outage, with QA refresh time cut from three days to six hours as an additional benefit.