Cement group exits an Oracle warehouse and OBIEE, cutting run cost 46%
Cement producer, 7 integrated plants and grinding units, about 35 MTPA capacity · Google Cloud Mumbai · 32 weeks
As-is situation
An on-prem Oracle data warehouse of about 34 TB fed by 1,150 Informatica PowerCenter workflows served plant, logistics and sales reporting through 720 OBIEE reports. The hardware was due for refresh at a quoted INR 9.2 crore, and Informatica and OBIEE support together cost about INR 1.4 crore a year. The nightly batch overran its window three or four times a week, delaying morning dispatch planning. Plant kiln data was summarised manually because the warehouse could not take historian volumes.
- INR 9.2 crore hardware refresh due within 14 months
- Nightly batch overruns 3-4 times a week, delaying dispatch planning
- 1,150 workflows and 720 reports with no usage data
Approach, tools and architecture
NTSPL analysed 12 months of Oracle and OBIEE usage and retired 38% of workflows and 61% of reports. The remaining schema and PL/SQL were translated with BigQuery Migration Service, and engineers fixed the 22% of procedures that needed manual work. Informatica mappings were rebuilt as Dataform models orchestrated by Cloud Composer. History moved as Parquet through Storage Transfer Service. Four waves (finance, sales and dispatch, procurement, plant) each ran in parallel for six to eight weeks, and Looker replaced OBIEE for retained reports.
Implementation approach
Measured results
Operational improvements
- Kiln historian data now lands in BigQuery and is joined with quality and dispatch data
- Engineering team reviews changes through Git pull requests instead of editing workflows in production
Cost considerations
BigQuery runs on an Enterprise edition reservation with autoscaling for month-end, plus Looker platform licences. Dual running for 18 weeks added about INR 35 lakh, budgeted upfront. The INR 9.2 crore hardware refresh was avoided entirely.
Return on investment
Avoided capex of INR 9.2 crore and annual run savings of about INR 1.4 crore against a programme cost of INR 1.9 crore. Payback was immediate on the capex comparison and within 16 months on run cost alone.