Steel plant traces every coil defect back to heat chemistry within 20 minutes
Integrated steel plant, 3.2 MTPA, hot strip mill and cold rolling complex · Azure Central India · 18 weeks
As-is situation
Level-2 automation historians recorded furnace, caster and mill parameters every second; the LIMS held heat chemistry; MES tracked slab-to-coil genealogy; and customer complaints sat in SAP QM. The quality team investigated surface defects by exporting all four into Excel, which took 3-5 days per complaint. A Hadoop cluster from 2018 held historian data but could not take updates when coils were re-graded, so genealogy in the lake was often wrong. Data scientists copied historian extracts to laptops for defect models.
- 3-5 days to assemble data for each customer defect complaint
- Coil re-grades and re-routing never reflected in the Hadoop copy of genealogy
- Three separate copies of historian data across Hadoop, the quality mart and laptops
Approach, tools and architecture
NTSPL designed an Azure Databricks lakehouse on Delta tables in ADLS Gen2 with Unity Catalog. Historian tags land in bronze every 5 minutes, LIMS and MES records arrive by CDC, and silver MERGE jobs maintain a heat-slab-coil genealogy table that absorbs re-grades in place. Gold tables join coil-length segments to process parameters and chemistry, clustered by coil ID. Quality engineers query through Databricks SQL and Power BI, and the defect model trains on the same silver tables. The Hadoop cluster was retired after four months.
Implementation approach
Measured results
Operational improvements
- Process engineers review the top 10 parameter deviations for each defect type weekly
- Defect model retrains monthly on the same governed tables used for reporting
Cost considerations
Job clusters run on spot-eligible VMs for bronze and silver; a small serverless SQL warehouse serves BI. Run cost is about INR 6.5 lakh a month, against INR 4.8 lakh for Hadoop support, power and hardware amortisation, but with far more capability.
Return on investment
Faster complaint closure cut claims and downgrades by an estimated INR 2.4 crore a year, mostly from automotive-grade customers. Build cost of INR 88 lakh pays back in under six months of avoided claims. Retiring Hadoop also removed a 2026 hardware refresh.