India’s Leading Domain & Web Hosting Provider

  • Chat
    Live Chat 24 X 7 online support
  • Contact NTSPL Hosting support
    Call Now +91 - 8260003333
Microsoft AzureDecorative paints manufacturingManufacturing & Industrial

Paints maker builds a dealer-tinting data strategy that ties shade demand to production

Regional paints company, 4 plants, 26 depots, 18,000 dealers with tinting machines · Gujarat and Maharashtra, with pan-India dealers · 7 weeks strategy, 10 weeks to first data product

Amazon Web Services
01

As-is situation

Tinting machines at 18,000 dealers logged every shade dispensed, but the files sat on a vendor portal and were never joined to SAP sales or depot stock. Planning forecast base paint by pack size from last year's dispatches, so fast-moving bases ran out in 9 of 26 depots each festive season while slow shades aged past shelf life. Sales, supply chain and marketing each kept separate Excel models. A previous attempt to buy a BI tool stalled because no one agreed what a 'shade' or an 'active dealer' meant.

  • Tinting data for 18,000 dealers never joined to SAP sales, depot stock or schemes
  • Base-paint stock-outs in 9 of 26 depots each October-November peak
  • No shared definition of active dealer, shade family or secondary sales across three functions
02

Approach, tools and architecture

NTSPL ran a seven-week strategy and architecture sprint. We defined five domains (Dealer, Product and Shade, Sales, Inventory, Schemes) and agreed that an active dealer is one with a tinting or billing event in 60 days. Because SAP, Microsoft 365 and Entra ID were already on Azure, the target state is Fabric on OneLake in Central India, with the tinting vendor's daily files landing through Data Factory. We specified one data product for phase one: a weekly base-paint demand signal by depot, built from shade-to-base conversion tables.

Tinting files + SAP SD/MM → domain map → Fabric OneLake design → depot demand signal → S&OP
Microsoft FabricAzure Data FactoryPower BIMicrosoft PurviewSAP S/4HANA (source)
03

Implementation approach

Weeks 1-2 · Planning decisionsMapped 33 recurring S&OP, pricing and scheme decisions.
Weeks 3-4 · Shade and dealer definitionsBuilt the shade-to-base table and agreed active-dealer rules.
Weeks 5-6 · Target architectureDesigned per-domain Fabric workspaces; tested 90 days of tinting data against SAP.
Week 7 · RoadmapApproved a four-phase roadmap with a 10-week first release.
04

Measured results

Tinting dealers matched to SAP sales in test extract
0→14,600 of 18,000
Agreed cross-functional definitions
0 of 12 core terms→12 of 12 signed off
Depots with base-paint stock-outs in the following festive season
9 of 26→3 of 26 after the phase-one demand signal went live
Separate planning spreadsheets
3 functional models→1 shared demand signal

Operational improvements

  • Weekly S&OP opens with the depot base-paint signal instead of three forecasts
  • Dealer master duplicates down from 7% to under 1% under sales-ops stewardship
05

Cost considerations

Strategy fee was INR 21 lakh. Phase one runs on a Fabric F32 capacity paused outside business hours, around INR 2.6 lakh a month. The tinting vendor charges no extra for daily files, so ingestion cost is limited to Data Factory runs.

06

Return on investment

ROI indicator

Fewer festive stock-outs protected an estimated INR 3.8 crore of base-paint sales in one season, and ageing write-offs on slow shades fell by about INR 40 lakh. The sprint and first-year platform cost are recovered within the first peak season.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.