Microsoft AzureWater utilityEnergy, Utilities & Resources

Water utility sets recovery tiers for billing and complaints, keeping SCADA on site

City water supply and sewerage board, 9 lakh consumer connections · Madhya Pradesh · 4 weeks

Amazon Web Services
01

As-is situation

The utility was moving consumer billing, a complaints and tanker-booking portal, GIS asset maps, an HR and payroll system and a field-crew app to Azure. SCADA for pumping stations would stay on site. Backups ran to tape weekly with no tested restore in two years. Billing cycles ran on fixed days, and the complaints portal saw spikes of 6x during summer shortages. The board had issued a circular demanding a DR plan after a 3-day billing outage the previous year.

  • Weekly tape backup meant up to 7 days of potential data loss on billing
  • The complaints portal was critical in summer but low priority in monsoon
  • GIS data of 1.2 TB was needed by field crews within hours after any pipe burst
02

Approach, tools and architecture

NTSPL ran impact sessions with billing, operations and the commissioner's office. Billing and complaints became Tier 1 with Site Recovery from Central India to South India; GIS became Tier 2 with geo-redundant backup and a documented 8-hour restore; HR and payroll Tier 3. A seasonal rule raised the complaints portal's standby capacity from April to June. SCADA historians were documented as an on-site responsibility with separate backup, outside the cloud design. Immutable vaults were specified for billing data.

Impact sessions → tier register with seasonal rule → Site Recovery Central India to South India → geo-redundant backup → immutable billing vault
Azure Site RecoveryAzure BackupAzure Business Continuity CenterImmutable vaultsAzure Monitor alerts
03

Implementation approach

Weeks 1-2 · Impact sessionsBilling, operations and commissioner's office interviewed, with summer peaks quantified.
Week 3 · TieringSix systems tiered and a seasonal capacity rule written for complaints.
Week 4 · Board submissionDR plan with costs submitted to the utility board.
04

Measured results

Billing RPO
Up to 7 days→15 minutes in design
Tested restores per year
0→4 scheduled drills
Annual backup and DR cost
₹21 lakh tape and AMC→₹26 lakh modelled

Operational improvements

  • Seasonal DR capacity rule tied to the summer operations calendar
  • Board receives a drill report every quarter
05

Cost considerations

The assessment used 11 consultant days. DR cost rises by about ₹5 lakh a year over tape, accepted against a billing outage that delayed collections of roughly ₹14 crore by three days.

06

Return on investment

ROI indicator

The board's DR requirement was met with costed tiers. Faster recovery of billing protects monthly collections, and avoiding another multi-day outage was valued well above the added annual cost.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.