India’s Leading Domain & Web Hosting Provider
Water utility sets recovery tiers for billing and complaints, keeping SCADA on site
City water supply and sewerage board, 9 lakh consumer connections · Madhya Pradesh · 4 weeks
As-is situation
The utility was moving consumer billing, a complaints and tanker-booking portal, GIS asset maps, an HR and payroll system and a field-crew app to Azure. SCADA for pumping stations would stay on site. Backups ran to tape weekly with no tested restore in two years. Billing cycles ran on fixed days, and the complaints portal saw spikes of 6x during summer shortages. The board had issued a circular demanding a DR plan after a 3-day billing outage the previous year.
- Weekly tape backup meant up to 7 days of potential data loss on billing
- The complaints portal was critical in summer but low priority in monsoon
- GIS data of 1.2 TB was needed by field crews within hours after any pipe burst
Approach, tools and architecture
NTSPL ran impact sessions with billing, operations and the commissioner's office. Billing and complaints became Tier 1 with Site Recovery from Central India to South India; GIS became Tier 2 with geo-redundant backup and a documented 8-hour restore; HR and payroll Tier 3. A seasonal rule raised the complaints portal's standby capacity from April to June. SCADA historians were documented as an on-site responsibility with separate backup, outside the cloud design. Immutable vaults were specified for billing data.
Implementation approach
Measured results
Operational improvements
- Seasonal DR capacity rule tied to the summer operations calendar
- Board receives a drill report every quarter
Cost considerations
The assessment used 11 consultant days. DR cost rises by about ₹5 lakh a year over tape, accepted against a billing outage that delayed collections of roughly ₹14 crore by three days.
Return on investment
The board's DR requirement was met with costed tiers. Faster recovery of billing protects monthly collections, and avoiding another multi-day outage was valued well above the added annual cost.