Google CloudHospitality (hotel group)Healthcare & Life Sciences

Hotel group's TCO shows Google Cloud wins only with a colocation exit, and times it

Group of 16 business and leisure hotels, 2,300 rooms · Goa, Rajasthan, Kerala and Delhi NCR · 5 weeks

Amazon Web Services
01

As-is situation

The group's central reservation system, PMS integration hub, revenue management, loyalty and finance ran on 74 servers in a Gurugram colocation facility, with property servers at each hotel. The colocation contract renewed every two years with a three-month notice period. Hardware was three years old. The board's question was whether moving to Google Cloud made financial sense now, or only at the next refresh. Two vendors had quoted conflicting answers, both using list prices.

  • Hardware was only three years old, so refresh savings did not arise until year three
  • Occupancy swung from 45 to 90 percent between monsoon and peak season
  • Colocation exit was possible only at renewal, 14 months away
02

Approach, tools and architecture

NTSPL built a five-year model from Migration Center TCO output, colocation invoices and seasonal utilisation. Three timing scenarios were run: migrate now, migrate to hit the colocation renewal, and migrate at hardware refresh. Seasonal tiers were priced with committed use discounts on the baseline and on-demand for peak months in Google Cloud Mumbai, with Delhi for DR. Only the scenario aligned to colocation exit produced positive NPV in year two; migrating now added 14 months of dual running.

Migration Center TCO + colocation invoices → seasonal utilisation → three timing scenarios → CUD modelling → recommended exit-aligned plan
Migration Center TCO reportsGoogle Cloud Pricing CalculatorCommitted use discountsCompute EngineCloud SQL (modelled)
03

Implementation approach

Weeks 1-2 · EvidenceInvoices, seasonal utilisation and contract terms collected.
Weeks 3-4 · Timing scenariosThree migration timings modelled with dual running and commitments.
Week 5 · Board decisionRecommendation to migrate in the 12 months before renewal accepted.
04

Measured results

Five-year NPV, migrate now
Not modelled→Negative ₹38 lakh
Five-year NPV, exit-aligned
Not modelled→Positive ₹1.15 crore
Peak-to-baseline compute ratio
Unknown→1.9x, priced on demand

Operational improvements

  • Colocation notice date added to the board's risk calendar
  • Seasonal capacity plan reused for budgeting each year
05

Cost considerations

The assessment used 16 consultant days. Committed use discounts were limited to baseline capacity so monsoon months do not carry idle commitments.

06

Return on investment

ROI indicator

Choosing the exit-aligned timing turned a negative case into a positive ₹1.15 crore NPV at the group's 13 percent hurdle rate, and stopped a premature migration that would have paid for colocation and cloud together.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.