India’s Leading Domain & Web Hosting Provider

  • Chat
    Live Chat 24 X 7 online support
  • Contact NTSPL Hosting support
    Call Now +91 - 8260003333
Microsoft AzurePharmaceutical API manufacturingHealthcare & Life Sciences

API manufacturer moves a GxP-validated SAP landscape to Azure without re-validation delays

Active pharmaceutical ingredient manufacturer, 3 USFDA-inspected sites, 2,800 employees · Southern India (Hyderabad and Visakhapatnam) · 18 weeks

Amazon Web Services
01

As-is situation

SAP ECC 6.0 EHP7 on HANA 2.0 ran on an on-premises appliance with 1.5 TiB of memory, along with SAP QM, PP-PI, MM and an integrated LIMS. The system was validated under the company's computer system validation programme for 21 CFR Part 11 and EU GMP Annex 11, including electronic batch record approvals. The appliance was out of warranty in 9 months. A previous attempt to move to a hosting provider stalled because QA could not obtain installation and operational qualification evidence for the infrastructure, and an FDA inspection was expected within the year.

  • HANA appliance warranty ending in 9 months
  • GxP-validated SAP requiring IQ and OQ evidence for any infrastructure change
  • Electronic batch record approvals that could not tolerate data loss
  • Expected regulatory inspection in the same year
02

Selected Microsoft Azure services and architecture

NTSPL deployed the landscape with infrastructure-as-code so every VM, storage volume and network setting is version-controlled and reproducible, generating IQ evidence directly from deployment outputs and Azure Policy compliance reports. Production HANA runs on a certified M-series VM in Central India with zonal HSR to a second VM and Pacemaker fencing, storage on Premium SSD v2 validated with HCMT. OQ test scripts covered failover, backup restore and audit trail retention. Azure Backup for SAP HANA writes to an immutable vault, and asynchronous HSR to South India provides DR. Change control for Azure is tied into the existing GxP change management process.

Plant and QA users → ExpressRoute → SAP Web Dispatcher → application servers (Central India zones) → HANA on M-series with zonal HSR and Pacemaker → async HSR to South India + Backint backups to immutable vault
Azure M-series VMsPremium SSD v2Azure Backup for SAP HANAAzure Monitor for SAP solutionsAzure PolicyAzure Site Recovery
03

Implementation approach

Weeks 1-4 · Validation planningAgreed the validation approach with QA, including supplier assessment, IQ and OQ protocols and the change control process for cloud infrastructure.
Weeks 5-10 · Build and qualifyDeployed the landscape from code, ran HCMT and executed IQ, then OQ tests for HA failover, backup and restore.
Weeks 11-15 · Migration rehearsalsRan two HANA backup-restore rehearsals to Azure with full PQ test scripts executed by key users.
Weeks 16-18 · Go-liveMigrated over a planned 36-hour weekend shutdown, completed PQ, and released the system under QA approval.
04

Measured results

Time to produce infrastructure IQ evidence
Weeks of manual screenshots→Generated from deployment outputs in 1 day
HANA high availability
Single appliance, no HA→Zonal HSR with automatic failover
Batch record RPO
Daily backup→Near zero within region; under 5 minutes cross-region
Inspection observations on SAP infrastructure
Not applicable (first cloud inspection)→No observations

Operational improvements

  • Infrastructure changes follow GxP change control with code diffs as evidence
  • HA failover is tested and documented rather than assumed
  • Basis team monitors HANA replication and cluster health through Azure Monitor for SAP solutions
05

Cost considerations

Three-year reservations cover production HANA and ASCS VMs. Premium SSD v2 was chosen over ANF because the 1.5 TiB system did not need ANF snapshots and it cost less. The DR VM is a smaller certified size with a resize step, accepted because the business RTO for DR was 4 hours.

06

Return on investment

ROI indicator

Indicatively, avoiding an appliance refresh of INR 2.5 to 3.5 crore and the cost of a third-party hosting attempt makes the move cash-positive within 2 years. Faster, code-generated qualification evidence also cut the time needed for future infrastructure changes by weeks.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.