As-is situation
The firm ran 22 Windows Server VMs on two ageing Hyper-V hosts in its head-office server room: Tally Prime with shared company data, an audit working-paper application on SQL Server 2016, a document management server and a tax computation tool. Article assistants at client sites reached the apps through a port-forwarded RDP gateway. During the September and October tax-audit filing peak, CPU on the RDS host sat near 100 percent, logons took over four minutes and the office lost two working days in one season to a UPS failure. The hosts were out of warranty and a refresh quote stood at INR 38 lakh.
- Single RDS host saturated at 100 percent CPU for roughly six weeks each tax-audit season
- Public RDP endpoint exposed to the internet, with 14,000+ failed logon attempts logged in one month
- No offsite DR: a UPS failure caused two days of downtime during the 30 September filing deadline
- INR 38 lakh hardware refresh due, with Windows Server and SQL Server licences under Software Assurance going unused elsewhere
Selected Microsoft Azure services and architecture
NTSPL moved the estate to Central India with Azure Migrate. Tally, the audit application and the tax tool were published as RemoteApps from an Azure Virtual Desktop pooled host pool of D8s v5 Windows 11 multi-session hosts, with FSLogix profiles on Azure Files Premium. A scaling plan keeps two hosts warm off-season and ramps to seven during September and October. SQL Server moved to an E8s v5 VM with Premium SSD v2 data and log disks, licensed through Azure Hybrid Benefit. Access requires Entra ID Conditional Access with MFA, and the public RDP endpoint was closed. Azure Site Recovery replicates the SQL and document servers to South India.
Implementation approach
Measured results
Operational improvements
- Filing-season capacity is a scaling-plan change, not an emergency hardware purchase; hosts ramp from two to seven automatically
- IT executive patches hosts through Azure Update Manager in scheduled windows instead of after-hours visits to the server room
- Partners can onboard a new article assistant at a client site in under 15 minutes with no VPN client
Cost considerations
Host VM hours were the main cost, so the scaling plan was tuned to deallocate hosts after 8 pm and on Sundays. Existing Windows Server and SQL Server licences with Software Assurance were applied through Hybrid Benefit. Session hosts stay on pay-as-you-go because of the seasonal swing; the SQL VM moved to a 3-year Reservation after 90 days.
Return on investment
Avoiding the INR 38 lakh hardware refresh and applying existing licences through Hybrid Benefit puts the three-year Azure cost at an indicative 20-30 percent below the on-premises refresh path. The larger gain is billable time: partners estimate 300-400 recovered staff hours in the first filing season, giving an indicative payback inside 14 months.