EPC contractor consolidates 11 site file servers and 380 TB of drawings onto FSx and S3
Mid-size EPC firm, about 4,500 employees including site staff, 40 active projects · Pan-India project sites, head office in Eastern India · 16 weeks
As-is situation
Design teams at head office worked on AutoCAD and Revit drawings on a Windows file cluster with 120 TB, while 11 large project sites each ran their own small file server for local drawings and daily progress photos. Site engineers photographed work from phones and uploaded through a shared folder over 4G links. Drawing revisions conflicted between sites and head office, the archive of closed projects held about 260 TB on tape and USB disks, and retrieving a drawing for an arbitration claim once took nine days.
- Eleven unmanaged site servers, three of which failed in a year with partial data loss
- About 22,000 site photos a day uploaded over unreliable 4G links into SMB shares
- Closed-project archive of roughly 260 TB on tape, with retrieval times of days for legal disputes
- Contract obligations to retain project records for up to 10 years after completion
Selected AWS services and architecture
NTSPL deployed Amazon FSx for Windows File Server Multi-AZ in ap-south-1, joined to the firm's Active Directory, as the single source of active drawings, with DFS namespaces preserving existing drive mappings. Large sites got an Amazon FSx File Gateway for local cached access over their links. Site photos moved off SMB: a lightweight mobile upload app requests S3 presigned URLs and uploads directly with retries, tagging each photo with project, location and date. A lifecycle rule moves photos to Glacier Instant Retrieval after 60 days. Closed projects were restored from tape into S3 Glacier Flexible Retrieval with Object Lock governance mode set to the contractual retention period.
Implementation approach
Measured results
Operational improvements
- IT no longer travels to sites to replace failed file servers; gateways are managed centrally
- Photos are searchable by project, location and date tags instead of folder names typed by site staff
- Legal teams request closed-project drawings through a ticket that restores data in hours, not by recalling tapes
Cost considerations
FSx throughput capacity was sized to head-office peak hours rather than storage size, which kept the file system cost moderate. Glacier Flexible Retrieval was preferred over Deep Archive for closed projects because arbitration requests need same-day bulk restores. Data transfer over site 4G links was the trade-off accepted for retiring local servers.
Return on investment
Indicatively the firm avoids INR 2.5-3 crore of planned storage hardware refresh over five years and saves about INR 50 lakh a year in running costs. Faster access to archived drawings has already shortened document production for two arbitration cases, where delays had previously carried cost and credibility risk.