AWSEPC and infrastructure constructionProfessional Services & Real Estate

EPC contractor consolidates 11 site file servers and 380 TB of drawings onto FSx and S3

Mid-size EPC firm, about 4,500 employees including site staff, 40 active projects · Pan-India project sites, head office in Eastern India · 16 weeks

Amazon Web Services
01

As-is situation

Design teams at head office worked on AutoCAD and Revit drawings on a Windows file cluster with 120 TB, while 11 large project sites each ran their own small file server for local drawings and daily progress photos. Site engineers photographed work from phones and uploaded through a shared folder over 4G links. Drawing revisions conflicted between sites and head office, the archive of closed projects held about 260 TB on tape and USB disks, and retrieving a drawing for an arbitration claim once took nine days.

  • Eleven unmanaged site servers, three of which failed in a year with partial data loss
  • About 22,000 site photos a day uploaded over unreliable 4G links into SMB shares
  • Closed-project archive of roughly 260 TB on tape, with retrieval times of days for legal disputes
  • Contract obligations to retain project records for up to 10 years after completion
02

Selected AWS services and architecture

NTSPL deployed Amazon FSx for Windows File Server Multi-AZ in ap-south-1, joined to the firm's Active Directory, as the single source of active drawings, with DFS namespaces preserving existing drive mappings. Large sites got an Amazon FSx File Gateway for local cached access over their links. Site photos moved off SMB: a lightweight mobile upload app requests S3 presigned URLs and uploads directly with retries, tagging each photo with project, location and date. A lifecycle rule moves photos to Glacier Instant Retrieval after 60 days. Closed projects were restored from tape into S3 Glacier Flexible Retrieval with Object Lock governance mode set to the contractual retention period.

Head-office designers → FSx for Windows File Server (Multi-AZ, AD-joined) ← FSx File Gateway at sites; site engineers' phones → presigned URL → S3 → Glacier Instant Retrieval; closed projects → S3 Glacier Flexible Retrieval with Object Lock
Amazon FSx for Windows File ServerAmazon FSx File GatewayAmazon S3S3 Glacier Instant RetrievalS3 Glacier Flexible RetrievalS3 Object LockAWS DataSync
03

Implementation approach

Weeks 1-3 · Discovery and permissions mappingAudited share permissions and DFS paths across head office and 11 sites and agreed a single folder structure per project.
Weeks 4-7 · FSx deployment and active data migrationBuilt FSx Multi-AZ, ran DataSync incremental copies for 120 TB of active drawings and cut over head office over a weekend.
Weeks 8-11 · Site rollout and photo appInstalled File Gateways at large sites, retired small site servers and launched the presigned-URL photo upload app.
Weeks 12-16 · Archive restorationRestored 260 TB of closed-project data from tape to S3 Glacier Flexible Retrieval and indexed it by project and contract number.
04

Measured results

Site file servers to maintain
11→0 (gateways only at 4 large sites)
Drawing retrieval for closed projects
Up to 9 days→Within about 12 hours (bulk) or minutes (indexed)
Failed or duplicated site photo uploads
~8% per day→Under 0.5%
Annual storage and backup cost
~INR 1.1 crore (hardware, tape, AMC)→~INR 58 lakh

Operational improvements

  • IT no longer travels to sites to replace failed file servers; gateways are managed centrally
  • Photos are searchable by project, location and date tags instead of folder names typed by site staff
  • Legal teams request closed-project drawings through a ticket that restores data in hours, not by recalling tapes
05

Cost considerations

FSx throughput capacity was sized to head-office peak hours rather than storage size, which kept the file system cost moderate. Glacier Flexible Retrieval was preferred over Deep Archive for closed projects because arbitration requests need same-day bulk restores. Data transfer over site 4G links was the trade-off accepted for retiring local servers.

06

Return on investment

ROI indicator

Indicatively the firm avoids INR 2.5-3 crore of planned storage hardware refresh over five years and saves about INR 50 lakh a year in running costs. Faster access to archived drawings has already shortened document production for two arbitration cases, where delays had previously carried cost and credibility risk.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.