India’s Leading Domain & Web Hosting Provider
Fund registrar converts 3,400 Oracle objects to AlloyDB and exits Enterprise Edition
Registrar servicing 14 smaller asset managers and AIFs, about 46 lakh folios · Google Cloud Mumbai · 23 weeks
As-is situation
Folios, transactions and statements ran on Oracle 19c Enterprise Edition with RAC on two ageing on-premises servers. The schema held 3,400 objects, including 1,150 PL/SQL packages and procedures computing NAV-based allotments, exit loads and capital-gains statements. Oracle support, RAC options and hardware maintenance cost INR 2.3 crore a year. Month-end statement runs took 14 hours on a single node, generating files through UTL_FILE and scheduling through DBMS_JOB, and the servers were due for replacement within a year at an estimated INR 1.4 crore.
- INR 2.3 crore a year in Oracle EE support, RAC options and hardware maintenance
- A 14-hour month-end statement batch bound by single-node CPU
- 1,150 PL/SQL units relying on UTL_FILE output and DBMS_JOB scheduling
Approach, tools and architecture
NTSPL used Database Migration Service conversion workspaces to convert the schema to AlloyDB for PostgreSQL; 81% of objects converted automatically. The remaining 640 followed a 22-pattern library: UTL_FILE statement generation moved to Cloud Run jobs writing to Cloud Storage, DBMS_JOB schedules to Cloud Scheduler, and autonomous-transaction audit logging to a small audit service. Allotment and exit-load functions were rewritten in PL/pgSQL with NUMERIC(20,4) precision and tested against 18 months of transactions to the paisa. DMS continuous migration kept AlloyDB in sync until cutover, with a cross-region secondary cluster for DR.
Implementation approach
Measured results
Operational improvements
- Statement generation scales out as parallel Cloud Run job tasks instead of competing with online transactions
- Database changes are reviewed in Git with unit tests per function
Cost considerations
Services cost INR 1.08 crore over 23 weeks. The AlloyDB primary, read pool and secondary cluster cost about INR 6.2 lakh a month, and Oracle support ended after a four-week fallback window with no reversal needed.
Return on investment
Annual savings of about INR 1.56 crore repay the programme in roughly eight to nine months, before counting the INR 1.4 crore hardware refresh that was avoided. Faster runs also meet statement dispatch timelines with a full day to spare.