B2B CRM SaaS catches up three GKE versions without a customer-visible outage

Sales CRM for mid-market Indian companies, about 2,400 customer workspaces · Google Cloud Mumbai (asia-south1) · 10 weeks

Amazon Web Services
01

As-is situation

The CRM ran 70 microservices on three GKE Standard clusters: production, staging and an internal tools cluster. The clusters had been opted out of a release channel two years earlier after an auto-upgrade broke an ingress controller. They were now three minor versions behind and approaching end of support, after which GKE would upgrade them automatically. A scan found 41 Helm releases using removed API versions, a cert-manager release incompatible with newer versions, and 12 deployments with a single replica and a PDB allowing zero disruption.

  • Three minor versions behind, with automatic upgrade due within about two months
  • 41 Helm releases using removed API versions
  • 12 single-replica deployments that would block node drains
02

Approach, tools and architecture

NTSPL scanned with Pluto and GKE deprecation insights and ticketed fixes to service owners with exact manifest changes. Cert-manager, ingress-nginx and external-dns were moved to an Argo CD repository with pinned versions and upgraded ahead of Kubernetes. The 12 deployments moved to two replicas with sensible PDBs. We then upgraded staging and soaked for a week per version, and production one version every two weeks with surge upgrades during 1 a.m.-5 a.m. windows. Clusters were enrolled in the Stable channel with maintenance exclusions around quarter-end sales pushes.

Pluto and deprecation insights → app owner tickets → Argo CD add-on upgrades → staging upgrade and soak → production surge upgrade → Stable channel with exclusions
GKE StandardGKE release channelsArgo CDPlutoBackup for GKE
03

Implementation approach

Weeks 1-2 · Scan and ticketsFound 41 deprecated releases and raised fixes with service owners.
Weeks 3-4 · Add-ons and replicasMoved add-ons to GitOps and fixed single-replica deployments.
Weeks 5-10 · Three upgrade roundsStaging then production, one minor version every two weeks.
04

Measured results

Versions behind latest
3→0, on Stable channel
Customer-visible downtime during upgrades
Previous upgrade: 3-hour ingress outage→None across three rounds
Node drains blocked by PDBs
12 deployments→0

Operational improvements

  • Upgrades now run quarterly on a published calendar
  • Add-on versions are visible and reviewed in Git
05

Cost considerations

Surge upgrades add extra nodes for an hour or two per node pool in each round. Backup for GKE was enabled before each production round, with backups retained for 14 days, and the staging soak used the existing staging cluster without resizing.

06

Return on investment

ROI indicator

Avoiding a forced upgrade with 41 broken releases protected a platform where a three-hour outage had previously triggered SLA credits to enterprise customers. The two-person platform team also got back to building developer tooling instead of firefighting.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.