India’s Leading Domain & Web Hosting Provider

  • Chat
    Live Chat 24 X 7 online support
  • Contact NTSPL Hosting support
    Call Now +91 - 8260003333
Microsoft AzureElectricity distribution (DISCOM)Retail, E-commerce & Consumer

Electricity DISCOM cuts costly real-time market purchases with a 15-minute load forecast

State-owned distribution company, 72 lakh consumers, about 9 GW peak demand · Azure Central India · 14 weeks

Amazon Web Services
01

As-is situation

The power purchase cell forecast next-day demand in 15-minute blocks using a spreadsheet of the same day last year, adjusted by engineers for weather and holidays. Day-ahead forecast error averaged 6.8% MAPE and rose above 12% during monsoon onset and heat waves. Shortfalls were covered by buying in the real-time market at high prices, and surpluses forced backing down contracted plants while still paying fixed charges. Feeder-level SCADA data and IMD forecasts existed but were not used systematically. Forecasts took two engineers three hours daily.

  • Day-ahead block forecast error of 6.8% MAPE, above 12% in weather events
  • High-cost real-time market purchases to cover shortfalls
  • SCADA, weather and holiday calendars not combined in any model
02

Approach, tools and architecture

NTSPL built a feature pipeline in Azure Databricks combining four years of 15-minute SCADA demand by circle, IMD and private weather forecasts for 31 districts, holiday and festival calendars, and agricultural feeder schedules. Gradient-boosted models per circle, compared against the spreadsheet baseline, produce day-ahead and intraday forecasts with prediction intervals. MLflow tracks experiments and the registry requires power purchase cell approval for promotion. Forecasts feed the scheduling desk at 8 a.m. for day-ahead bidding and refresh every two hours intraday.

SCADA + weather forecasts + calendars → Databricks feature tables → circle-level boosted models → MLflow registry approval → day-ahead and intraday forecasts → scheduling desk
Azure DatabricksMLflowDelta LakeAzure Data FactoryPower BI
03

Implementation approach

Weeks 1-3 · BaselineMeasured the spreadsheet method's error by season and circle.
Weeks 4-8 · Features and modelsBuilt weather, calendar and feeder features and trained circle-level models.
Weeks 9-11 · Shadow runRan forecasts alongside the spreadsheet for six weeks.
Weeks 12-14 · Go-liveMoved the scheduling desk to model forecasts with interval bands.
04

Measured results

Day-ahead forecast MAPE
6.8%→3.9%
MAPE during weather events
Above 12%→About 6.5%
Energy bought in real-time market
4.1% of monthly purchase→2.3%
Forecast preparation effort
2 engineers, 3 hours daily→15-minute review

Operational improvements

  • Scheduling desk plans backing down of contracted plants with prediction intervals instead of single numbers
  • Heat-wave and monsoon alerts adjust intraday forecasts automatically every two hours
05

Cost considerations

Training runs weekly on job clusters and scoring is light, so compute is under INR 1.5 lakh a month. Paid weather data costs more than the platform; it was negotiated as an annual district-level subscription.

06

Return on investment

ROI indicator

Shifting 1.8% of purchases out of the real-time market saves an estimated INR 25-35 crore a year at typical price differences. The INR 58 lakh build paid back within the first month of summer operation.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.