Two-wheeler lender sees EMI bounces by 11 a.m. instead of the next morning
Vehicle-finance NBFC, 9 lakh active loans, 1,100 dealer points · AWS Mumbai · 10 weeks
As-is situation
Loan origination and loan management ran on Oracle 19c on-prem. A nightly export of 14 tables took 5 hours 40 minutes, finished after 7 a.m., and locked the repayment table during early collections. NACH presentation results arrived from the sponsor bank at 9 a.m. as files, but bounce analysis only appeared next day. Collection agents therefore called customers whose EMIs had already cleared, and missed early contact with genuine bounces. Twice a quarter a new column broke the extract unnoticed.
- 5 hour 40 minute nightly export overran into branch hours and locked repayment tables
- Bounce lists reached 2,400 field agents a day late, hurting first-week recovery
- Two silent extract failures a quarter from unannounced schema changes
Approach, tools and architecture
NTSPL enabled supplemental logging on the Data Guard standby and set up AWS DMS CDC tasks per schema into an S3 raw zone in Mumbai, with Iceberg bronze tables merged every 10 minutes by Glue jobs. NACH response files land through a validated SFTP drop with manifest checks. A Redshift Serverless mart joins mandates, presentations and responses to publish a bounce list by 11 a.m. A drift policy lets new nullable columns through and blocks renames with an alert to the LMS team.
Implementation approach
Measured results
Operational improvements
- Collection calls to customers whose EMI had already cleared dropped by about 30,000 a month
- DBA team reclaimed the 2 a.m.-7 a.m. window for patching and index maintenance
Cost considerations
DMS on a mid-size replication instance, Glue merges and Redshift Serverless together run near INR 1.6 lakh a month, below the cost of the extra on-prem storage the nightly dumps had needed. Build cost was INR 34 lakh.
Return on investment
A 9-point lift in 7-day recovery on about 38,000 monthly bounces reduces roll-forward into higher buckets; finance estimates INR 1.2 crore a year in lower provisioning and collection cost. Payback is under five months. The build is also reused for the dealer-funding mart.