Seed company refactors dealer ordering off MSMQ and file shares before kharif peak

Hybrid seed company with 4,500 dealers across 11 states · Hyderabad and Aurangabad, India · 11 weeks

Amazon Web Services
01

As-is situation

Dealer orders and seed lot certificates ran through a .NET Framework 4.6 web app on two IIS servers. Orders were posted to MSMQ on the first server and processed by a Windows service that wrote lot certificates as PDFs to a UNC share. If the first server restarted, queued orders were stuck. In the May-June kharif booking peak, order volumes rose eightfold and the Windows service fell four hours behind, leaving dealers without lot certificates for dispatch. Trucks waited at the warehouses.

  • MSMQ and the Windows service tied processing to one server.
  • An 8x kharif peak left certificate generation four hours behind.
  • Certificates on a UNC share were exposed to all domain users.
02

Approach, tools and architecture

NTSPL agreed eleven change items. The app was upgraded to .NET 8 so it could run on Linux App Service. MSMQ calls were replaced with Azure Service Bus queues using sessions per dealer to keep order sequence. The Windows service became a queue-triggered Azure Functions app that scales with backlog. Certificates are written to Blob Storage with access through short-lived links. Managed identities replaced the stored connection strings. Behaviour was checked with 600 recorded orders replayed through both builds. Dealers saw no change in screens.

Dealer portal on App Service → Service Bus sessions → Azure Functions → Blob Storage certificates → Azure SQL
Azure App ServiceAzure Service BusAzure FunctionsAzure Blob StorageManaged identitiesAzure SQL Database
03

Implementation approach

Weeks 1-2 · Change list and testsAgreed eleven items and recorded 600 historic orders.
Weeks 3-9 · SprintsUpgraded to .NET 8 and replaced MSMQ, the service and the share.
Weeks 10-11 · CutoverMoved data and switched before the first kharif bookings.
04

Measured results

Peak certificate backlog
4 hours→Under 3 minutes
Orders stuck after server restart
Up to 900→0
Users able to browse certificate folder
All domain users→None; link-based access only

Operational improvements

  • Dispatch teams receive lot certificates within minutes of order approval.
  • Dead-lettered orders alert the support desk immediately.
05

Cost considerations

Functions on a consumption-style plan cost little outside the two-month peak. App Service and Service Bus Standard cost about INR 70,000 a month. The .NET 8 upgrade was 40% of the effort but was required for Linux hosting.

06

Return on investment

ROI indicator

Faster certificates removed dispatch delays in the season when most annual revenue is booked. Retiring two IIS servers and their licences saves about INR 6 lakh a year, and the refactor cost less than half of a rewrite quote.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.