India’s Leading Domain & Web Hosting Provider
Brokerage back office moves 3.1 TB Oracle settlement database to RDS in a 14-minute window
Mid-size broker's back-office unit, 4.5 lakh active clients · Mumbai, India · 8 weeks
As-is situation
The back office ran settlement, margin reporting and client ledger on a 3.1 TB Oracle 19c database on a two-node RAC cluster in a Mumbai colo. Nightly batch for exchange obligation files ran from 7 p.m. to 1 a.m., and early-morning risk reports had to be ready by 7:30 a.m. RAC hardware was out of warranty, and one DBA covered patching, Data Guard and backups alone. The firm wanted no change to 1,100 PL/SQL packages because settlement logic had been audited.
- Only a weekend night window between batch end and Monday pre-open was available.
- 1,100 audited PL/SQL packages could not be altered.
- SEBI CSCRF required evidence of logging, encryption and access control on the new platform.
Approach, tools and architecture
NTSPL chose Amazon RDS for Oracle with bring-your-own-licence, Multi-AZ in Mumbai and cross-region snapshot copies to Hyderabad. The database was seeded with Data Pump exports staged in S3, then DMS CDC kept it in sync for three weeks with lag under 3 seconds. Validation compared checksums on 412 tables and ran 35 ledger queries supplied by operations. Two timed rehearsals set the window. Database Activity Streams fed audit records to a log archive held for 180 days. No PL/SQL package was changed.
Implementation approach
Measured results
Operational improvements
- DBA time on patching and backups fell by about half.
- CSCRF audit evidence now comes from one log archive.
Cost considerations
Bringing existing Oracle licences kept licence cost flat. RDS Multi-AZ costs more than the old RAC AMC, but removes the need for a hardware refresh. External tables were rewritten as S3 loads, the only code-adjacent change.
Return on investment
Avoiding a RAC hardware refresh of about INR 1.3 crore and halving DBA operations effort gives payback in about 20 months. Faster batch completion also adds margin before the 7:30 a.m. risk report deadline on heavy expiry days.