Luxury hotel switches its PMS and 14 interfaces to AWS in a 3-hour overnight window

Five-star resort with 240 rooms, 6 restaurants and a spa · Goa, India · 4 weeks of preparation, 3-hour cutover, 2 weeks of hypercare

Amazon Web Services
01

As-is situation

The resort's property management system ran on two on-site servers with interfaces to POS, door locks, telephone billing, the channel manager feeding OTAs, the spa system, and the group's central reservations. Fourteen interfaces in all. The PMS had moved once before, a version upgrade that overran by six hours and left the front desk on paper check-ins during a Sunday checkout rush. The hotel ran at 85% occupancy in season, and the cutover had to fit an overnight window before monsoon rates began.

  • 14 interfaces, including door locks and OTAs, had to work from the first check-in.
  • The previous upgrade overran by six hours.
  • Only one overnight window between night audit and 7 a.m. arrivals.
02

Approach, tools and architecture

NTSPL wrote a 146-step runbook timed from two full rehearsals on copies of live data. The door lock and channel manager vendors joined both rehearsals. Gates were set at night audit close, data validation, interface tests and a front desk test with a dummy reservation. The point of no return was 4:30 a.m. The switch used Route 53 records lowered to 60-second TTLs two days earlier. Hypercare ran for two weeks, with vendor contacts on a 72-hour roster. Night audit ran first.

Night audit → freeze → database sync to EC2 → interface tests → front desk test → Route 53 switch → hypercare war room
Amazon EC2Amazon Route 53Amazon CloudWatchAWS Site-to-Site VPNAWS Systems Manager
03

Implementation approach

Weeks 1-2 · RunbookWrote 146 steps with owners from IT, front office and vendors.
Weeks 3-4 · RehearsalsTwo rehearsals cut timing from 4 h 40 min to 2 h 50 min.
Cutover night and 2 weeks · HypercareSwitched in 3 hours and closed hypercare on day 14.
04

Measured results

Cutover duration
Previous upgrade overran by 6 hours→3 hours 5 minutes, within window
Interfaces working at first check-in
Not applicable→14 of 14
Severity 1 incidents in hypercare
Not applicable→0; 9 minor defects closed

Operational improvements

  • Night audit now completes 40 minutes faster on the cloud servers.
  • The runbook is reused for PMS version upgrades.
05

Cost considerations

Two rehearsals and vendor participation added about INR 2.5 lakh to the cutover budget. The hotel judged it worthwhile against the revenue at risk from a failed go-live in season. Hypercare cost was fixed for two weeks.

06

Return on investment

ROI indicator

One avoided night of paper check-ins and OTA overbookings in season protects more revenue than the whole cutover budget. The on-site PMS servers were retired, saving AMC and power costs of about INR 3 lakh a year.