India’s Leading Domain & Web Hosting Provider
Regional private bank designs RBI-ready controls before moving digital channels
Old private sector bank, 640 branches, mobile and internet banking users of about 40 lakh · Kerala and Tamil Nadu · 5 weeks
As-is situation
The bank planned to move internet banking front ends, the mobile banking middleware, an API gateway and customer onboarding to Azure, while core banking stayed on-premises. Security relied on a perimeter firewall pair with 3,400 rules, shared admin accounts held by a vendor, and a SIEM appliance retaining 90 days of logs. Internal audit asked how each control would exist after migration, and nobody could answer before the RBI inspection due in nine months.
- 3,400 firewall rules with no documented application owner for most
- Logs retained for 90 days, half CERT-In's 180-day requirement
- Vendor staff used 11 shared domain admin accounts
Approach, tools and architecture
NTSPL collected firewall exports, privileged group membership and SIEM source lists, then mapped 214 controls to Azure targets and the shared responsibility model. Rules were grouped by application flow; 1,980 with no hits in 90 days were dropped from the design. Shared accounts were replaced in design with named Entra ID identities and Privileged Identity Management approvals. A central log workspace in Central India with 180 days of interactive retention and longer archive was specified, with Azure Policy initiatives aligned to the bank's RBI control library.
Implementation approach
Measured results
Operational improvements
- Firewall rule requests now require an application flow reference
- Privileged vendor access approved per session with recording
Cost considerations
The assessment used 26 consultant days. Longer log retention added an estimated ₹9 lakh a year in log storage, accepted as a regulatory cost.
Return on investment
The bank went into inspection with controls designed, mapped and evidenced, and internal audit closed its pre-migration observation. Avoiding post-migration remediation under an inspection deadline was the primary return.