Microsoft AzurePharmaceutical manufacturingHealthcare & Life Sciences

Pharma manufacturer connects 4 GxP plants to Azure with validated network-as-code

Formulations manufacturer, 4 plants (2 USFDA-inspected), 3,400 employees · Western and Southern India · 18 weeks

Amazon Web Services
01

As-is situation

Each plant ran LIMS, QMS, a manufacturing historian and an electronic batch record system on local servers, with a corporate MPLS linking plants to the head office. A move of QMS and LIMS to Azure was stalled because the quality unit would not accept network changes that could not be validated: firewall rules were changed by email request, with no change history tied to change controls. Two plants had flat networks where packaging-line PCs could reach the historian. An audit observation noted that audit-trail data integrity depended on network controls that were not documented.

  • Network changes made by email with no traceable link to GxP change controls
  • Flat networks at two plants allowing packaging PCs to reach historian servers
  • QMS and LIMS cloud move blocked by validation concerns over connectivity
  • MPLS contract renewal requiring a decision on how plants would reach Azure
02

Selected Microsoft Azure services and architecture

NTSPL designed a hub-spoke network in Central India with ExpressRoute circuits from each of the two inspected plants and VPN from the other two, plus a DR hub in South India. GxP workloads (QMS, LIMS) sit in dedicated spokes separated from corporate spokes, with Azure Firewall Premium enforcing explicit allow rules only. All network configuration is Terraform in a Git repository; every merge requires a change-control number, and the pipeline produces an installation qualification report from the deployed state. Plant historians and batch-record servers stay on-site, onboarded to Azure Arc so Policy evaluates their configuration continuously. Plant networks were segmented into Purdue-style zones.

Plant QC labs and shop floor → segmented plant zones → ExpressRoute (inspected plants) or VPN (others) → Central India hub → Azure Firewall Premium → GxP spokes for QMS and LIMS; Arc-enabled historians governed in place
Azure ExpressRouteAzure VPN GatewayAzure Firewall PremiumAzure Virtual Network ManagerAzure Arc-enabled serversAzure Policy
03

Implementation approach

Weeks 1-4 · Validation planAgreed URS, risk assessment and IQ/OQ approach for network-as-code with the quality unit and CSV team.
Weeks 5-10 · Hub, spokes and circuitsBuilt hubs and GxP spokes through the pipeline and brought two ExpressRoute circuits and two VPN sites live.
Weeks 11-15 · Plant segmentation and ArcSegmented the two flat plant networks during planned shutdowns and onboarded historian and batch-record servers to Arc.
Weeks 16-18 · OQ and handoverExecuted operational qualification of firewall rules and failover, and released the network for QMS and LIMS migration.
04

Measured results

Network changes traceable to a change control
Not tracked→100 percent
Time to implement an approved firewall change
5-8 working days→1 working day
Packaging PCs able to reach historian servers
About 140→0
Plant-to-Azure latency for LIMS sessions
Not applicable (local)→12-18 ms

Operational improvements

  • Firewall rule changes go through pull requests linked to change controls, with automatic IQ evidence
  • Configuration drift on plant servers is flagged by Azure Policy through Arc instead of annual audits
  • The quality unit reviews network state from the repository rather than screenshots
05

Cost considerations

ExpressRoute was justified only for the two inspected plants with heavy LIMS and batch-record traffic; the other two use VPN. Firewall Premium was required for IDPS on GxP spokes. Arc server management costs apply to on-site servers, accepted as cheaper than revalidating systems moved to the cloud. Circuits are on 3-year provider contracts.

06

Return on investment

ROI indicator

Replacing the MPLS renewal with ExpressRoute and VPN cut annual WAN cost by an indicative INR 25-40 lakh. The larger value is unblocking the QMS and LIMS migration, which removes a planned INR 1-1.5 crore plant server refresh, while reducing the risk of data-integrity observations in the next inspection.

Illustrative scenario: a composite based on typical NTSPL engagement patterns for this industry and service. It does not describe a named customer. The figures are indicative, and actual results depend on the workload, its scale and the commercial terms.