India’s Leading Domain & Web Hosting Provider
Steel plant gets ransomware-ready MES recovery with air-gapped AWS copies
Integrated steel plant, 3 MTPA capacity, about 4,000 employees · Eastern India · 12 weeks
As-is situation
The Manufacturing Execution System, tracking heats, slab genealogy, quality results and dispatch, ran on eight VMware VMs in the plant's Level 3 server room, with Oracle on two of them. Backups went to a NAS on the same domain, replicated to a second NAS in the admin building 2 km away. A ransomware attack on a peer plant encrypted both NAS copies via domain admin credentials. Leadership asked the CIO how long MES would be down after a similar attack; the honest estimate was 10 to 14 days, at an indicative production loss of INR 2 to 3 crore per day if heat tracking stopped.
- Both backup copies reachable with the same domain admin credentials
- OT network policy allowed only outbound connections through a single firewall, with a 100 Mbps link
- Oracle MES database of 900 GB with about 35 GB daily change
- No clean environment to restore into if the plant domain itself was compromised
Selected AWS services and architecture
NTSPL designed recovery into AWS Mumbai, isolated from the plant domain. Elastic Disaster Recovery agents on the eight MES VMs replicated through the OT firewall over an outbound-only connection, throttled to 40 Mbps during shift hours. A separate AWS account with no trust to the plant Active Directory hosted the recovery environment and its own IAM Identity Center access. Daily Oracle RMAN backups were written to S3 with Object Lock in compliance mode for 35 days, and AWS Backup copied the staging snapshots into a logically air-gapped vault. A clean-room recovery VPC with fresh domain controllers was pre-built so MES could run without the compromised plant domain.
Implementation approach
Measured results
Operational improvements
- The plant now has a clean-room recovery procedure that does not depend on the corporate Active Directory surviving
- OT and IT teams share a joint drill calendar, with one ransomware simulation every six months
- Bandwidth throttling schedules mean DR replication never competes with shift-time SCADA traffic
Cost considerations
Bandwidth, not AWS fees, was the real constraint; NTSPL chose throttled replication over a costly link upgrade. The air-gapped vault added storage cost but was kept to 14 days of copies. Oracle licensing for recovery instances was confirmed with the licence team under existing terms before drills.
Return on investment
Total run cost is an indicative INR 70,000 to 95,000 per month. Reducing a potential 10 to 14 day MES outage to under a day protects a production exposure the plant valued at INR 20 crore or more per incident. The board treated it as insurance with a premium well under 1 percent of the exposure.