India’s Leading Domain & Web Hosting Provider
UPI payments app moves from fortnightly release nights to 30 canary deploys a week
Consumer UPI and bill-payments app with 1.1 crore monthly active users and 34 services · AWS Mumbai · 14 weeks
As-is situation
The app's 34 services already ran on Amazon EKS, but releases still went through a fortnightly release night. A Jenkins job built images on a shared server, a release manager edited Helm values by hand, and a 22-person change advisory board met every Tuesday. Change failure rate was 26%, mostly from configuration drift between staging and production. Rollback meant manually re-running the previous Helm release, which averaged 70 minutes while transaction success rates dropped. Jenkins held 19 static AWS access keys.
- 26% change failure rate and 70-minute manual rollbacks
- Fortnightly release nights bundling up to 140 changes
- 19 static AWS access keys in Jenkins, flagged in the sponsor bank's audit
Approach, tools and architecture
NTSPL moved the team to trunk-based development with feature flags in AWS AppConfig and replaced Jenkins jobs with GitHub Actions templates that build each image once, push to ECR and hand deployment to Argo CD. Argo Rollouts runs canaries at 5%, 25% and 100%, analysing UPI transaction success rate, p99 latency and error codes from the cluster's Prometheus; a 0.5 percentage-point drop in success rate aborts and rolls back automatically. GitHub OIDC roles scoped per environment replaced every static key. Preview namespaces per pull request run contract tests against payment-switch simulators.
Implementation approach
Measured results
Operational improvements
- The CAB now reviews only non-standard changes, about four a month
- Every deployment record links commit, ticket, approver and canary result for the sponsor bank's audits
Cost considerations
Services cost INR 48 lakh over 14 weeks. GitHub Actions minutes and larger runners add about INR 1.2 lakh a month, while retiring the Jenkins servers and release-night overtime saves roughly INR 90,000 a month.
Return on investment
Each failed release had cost an estimated INR 6-8 lakh in failed payments and support load. Fewer, smaller and faster-reverted failures are expected to avoid INR 70-90 lakh a year, repaying the programme within twelve months.